a
   
    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
  South Pars Gas Field Development Project Phase 17 & 18
  South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
   

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

   

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
 

Projects

Iran Air Administration  & Sales Office Building

Project:

Iran Air Administration  & Sales Office Building

Client:

Sazeh Consultants

Owner:

Iran Air

Location:

Khuzestan, Iran

The original scope of project consisted of renovation and remodeling the existing building. During the course of demolishing, the client decided to construct a new 4-story building (2900 SQM). Sazeh Consultants was assigned to design & construct the building on a fast track basis. The project consists of the following main components:

  • Sales counters, sales waiting hall, security & mechanical room on ground floor (838 SQM)
  • Administration offices and passport office on first floor (727 SQM)
  • Administration offices on second floor (600 SQM)
  • Administration offices on third floor (580 SQM)
  • Air handling & elevator room, on fourth floor (97 SQM)

Tehran Raymand was in charge of performing Basic and Detail Engineering of Building Services.

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved