a
   
    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
  South Pars Gas Field Development Project Phase 17 & 18
  South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
   

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

   

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
 

Projects

Darquain Oil Field Development 1st Stage

Project:

Darquain Oil Field Development 1st Stage

Client:

Sazeh Consultants

Owner:

National Iranian Oil Company (NIOC)

Location:

Khuzestan, Iran

Cooperation With Other Companies:

Sazeh Consultant Co.

Snamprogetti Ltd.

Services:

Detail engineering

Procurement services for local and foreign supplied equipment & material

During this stage, three appraisal wells, five development wells, and one gas injection well are supposed to be drilled. The expected oil production is 50,000 BOPD.

The surface facilities will be comprised of:

  1. Gathering system.
  2. A production facility with a sustainable oil treatment capacity (design condition) of 55,000 (peak rate 60,000) BOPD.
  3. A 17 Km 12” export oil pipeline to a tie-in point beyond the Karun river
Gas injection system to recover the gas production coming from the 1st and 2nd stages oil separators, with a gas compression capacity of 70 MMSCFD.
a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved