a
   
    South Pars Gas Field Development Project Phase 14
    Tang-E-Bijar & Kamankuh  gas field
    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
    South Pars Gas Field Development Project Phase 17 & 18
    South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

 

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

   

Lab Sefid Gas Gathering and Injection

    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
    Revamping and up-rating of Abadan Refinery Crude Distillation
    Khatoon Abad Copper Smelter
 

Projects

South Pars Gas Field Development Project Phase 14

Project:

South Pars Gas Field Development Project Phase 14

Client:

Industrial Projects Management of Iran (IPMI)

Owner:

Pars Oil & Gas Company (POGC)

Location:

Tombak, Iran

Services:

Detail engineering
Engineering Procurement Services

 

Phase 14 onshore Plant will be located on the Iranian coast of Persian Gulf in TOMBAK (at distance of approximately 130km from four wellhead platforms).

The Total capacity of Phase 14 onshore facilities is 2000 MMSCFD of reservoir fluid. This complex will include all processing units, utilities, offsite and infrastructure necessary to produce sales gas, gaseous ethane cut of petrochemical feedstock quality, commercial grade propane and butane for export and stabilized condensate.

Phase 14 onshore Complex is fed by the reservoir fluid delivered to the onshore plant (Tie-in) via two multiphase lines:

 

· Receiving facilities for HP separation of raw gas and condensate/water mixture.

 

· Condensate stabilization producing stabilized condensate as a feed of condensate demercaptanization unit and light ends recycled in the HP gas system.

 

· one condensate flashing unit, normally not operated, is provided as a back-up of the stabilization facilities.

 

· Gas treatment facilities producing sales gas, gaseous ethane and NGL’s and consisting of:

- H2S removal from gas / CO2 partial removal from gas

- Dehydration unit, using molecular sieves technology

- Mercury guard

- Ethane extraction unit producing sales gas, gaseous ethane and NGL’s

 

·  NGL fractionation facilities to produce gaseous ethane and sour liquid butane and propane.

·  Gaseous ethane cut treatment for CO2 removal and drying for further export.

·  Propane and butane treatment for mercaptan removal and drying for further storage and export.

·  Export gas compression to export pipeline pressure.

·  MEG regeneration and injection unit including MRU package to remove salt from MEG.

·  Sulphur recovery producing liquid Sulphur for further solidification and export.

·  Utilities, offsites required for operation..

·  Condensate Demercaptanization (DMC) unit for converting the mercaptanes of stabilized condensate to disulfides compounds and producing demercaptanized condensate for storage and export.

 

 Tehran Raymand Consulting Engineers has been contracted by IPMI to perform the detail engineering design and engineering procurement services for the gas and condensate treating processes of the onshore facilities. The units in Tehran Raymand scope of work are as follows:

 

1. U100         Reception Facilities

2. U101         Gas Treating Unit

3. U102         MEG Regeneration and Injection Unit

4. U103         Condensate Stabilization

5. U104         Gas Dehydration & Mercury Guard Unit

6. U105         Ethane Recovery Unit

7. U107         NGL Fractionation

8. U110         Condensate Back up Stabilization

9. U111         Propane Refrigerant Unit

10. U113       Caustic Regeneration

11. U114       Propane Treatment & Drying

12. U115       Butane Treatment & Drying

13. U116       Ethane Treatment and Drying

14. U140       Flare and Blowdown

15. U141       Utilities and Off site Drains

16. U142       Burn Pit

17. U143       Condensate Storage & Export

18. U145       Propane Refrigerant Storage

19. U147       Propane Storage & Export

20. U148       Butane Storage & Export

21. U176       SP/SS2/ITR1/ITR2

22. U176       SP/SS3/ITR3/ITR4

23. U176       SP/SS5/ITR7/ITR8

24. U176       SP/SS9/ITR9

25. U176       SP/SS10/ITR10

26. U176       SP/SS11

27. U160       MAIN CENTRAL PIPERACK

28. OSBL Pipeline

 

 

 

 

 

 

 

 

 

 

 

 

 

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 