Kharg Gas Gathering &NGL Recovery Project
Project: |
Kharg Gas Gathering (NGL Recovery) |
Client: |
IRITEC |
Owner: |
Iranian Offshore Oil Company (I.O.O.C) |
Location: |
Kharg Island |
Services: |
Project Management Interface Coordination
Detailed Engineering
Procurement Engineering Services |
IRITEC / IRASCO have been contracted
by the Iranian Offshore Oil Company (I.O.O.C) to conduct
the EPC for Kharg Island Gas Gathering and NGL Recovery
Project. This onshore project includes pipeline and
reception facilities, onshore compression, NGL trains,
NGL storage and export facilities. The NGL recovery
facility is a grass roots development and will consist
of the simultaneous development of two separate gas
treatments and NGL recovery plants sharing common
utilities and liquid export systems. Gas will be
gathered from both onshore and offshore sources. John
Brown Hydrocarbons had been contracted by I.O.O.C to
conduct the Basic Engineering and FEED for onshore
facilities of Kharg Island Gas Gathering and NGL
Recovery project.
Tehran Raymand Consulting Engineers has
been contracted by IRITEC to perform the detail design of
common system and interconnecting services of the project.
The scope of work includes Project Management / Interface
Coordination / Detailed Engineering / Procurement
Engineering Services for interconnecting area and common
facilities among the following process units:
Work Site No. Description
16/17/21 Reception
Facilities
21/22
Compression Station 1 / 2
21/22 Acid
Gas Removal 1 / 2 (including Mercury Removal, Dehydration)
21/22/23 NGL 1 / 2
23
Utility
24
Storage Tanks
29 Acid
Gas Injection
27/28
Seawater System
|