a
   
    South Pars Gas Field Development Project Phase 14
    Tang-E-Bijar & Kamankuh  gas field
    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
    South Pars Gas Field Development Project Phase 17 & 18
    South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

 

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
    Revamping and up-rating of Abadan Refinery Crude Distillation
    Khatoon Abad Copper Smelter
 

Projects

Kharg Gas Gathering &NGL Recovery Project

Project:

Kharg Gas Gathering (NGL Recovery)

Client:

IRITEC

Owner:

Iranian Offshore Oil Company (I.O.O.C)

Location:

Kharg Island

Services:

Project Management  Interface Coordination Detailed Engineering     Procurement Engineering Services

IRITEC / IRASCO have been contracted by the Iranian Offshore Oil Company (I.O.O.C) to conduct  the EPC for Kharg Island Gas Gathering and NGL Recovery Project. This onshore  project includes pipeline and reception facilities, onshore compression, NGL trains, NGL storage and export facilities.  The NGL recovery facility is a grass roots development and will consist of the simultaneous development of two separate gas treatments and NGL recovery plants sharing common utilities and liquid export systems. Gas will be  gathered from both onshore and offshore sources.  John Brown Hydrocarbons had been  contracted  by I.O.O.C to conduct the Basic Engineering and FEED for onshore facilities of Kharg Island Gas Gathering and NGL Recovery project. 

Tehran Raymand Consulting Engineers has been contracted by IRITEC to perform the detail  design of common system and interconnecting services of the project. The scope of  work  includes Project Management / Interface Coordination / Detailed Engineering / Procurement Engineering Services for interconnecting area and common facilities among the following process units: 

Work Site No.             Description

16/17/21                      Reception Facilities

21/22                           Compression Station  1 / 2

21/22                           Acid Gas Removal   1 / 2 (including Mercury Removal, Dehydration)

21/22/23                      NGL 1 / 2

 23                               Utility

 24                               Storage Tanks

 29                               Acid Gas Injection

27/28                           Seawater System

 

 

 

 

 

 

 

 

 

 

 

 

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved