    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
    South Pars Gas Field Development Project Phase 17 & 18
    South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

 

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
    Revamping and up-rating of Abadan Refinery Crude Distillation
    Khatoon Abad Copper Smelter
 

Projects

Azar & Changoleh Oil Fields Development Project

Project:

Azar & Changoleh Oil Fields Development Project

Client:

Petroleum Engineering and Development Company (PEDEC)

Owner:

National Iranian Oil Company (NIOC)

Location:

Eilam Province, Iran

Services:

Conceptual Study and Basic Engineering, FEED and EPC Tender Packages.

Azar & Changoleh Oil Fields Development Project is defined by Petroleum Engineering and Development Company (PEDEC) to produce crude oil from these two fields which are located near the international border with IRAQ.

1) Changouleh Field

The project overall scope is establishment of the minimum facilities and development of existing facilities (separators) for early production of heavy crude in order to achieve 15,000 BOPD of crude from two existing and two new wells. Final Production will be 75,000 BOPD.

Produced oil will then be transmitted to Dehloran Facilities by means of a Pump Station and a 127 Km, 20” export pipe line.

The facilities of Changouleh Field include:
• Well Head Facilities
• 8” flow lines
• 3 Phase Separator
• Storage Tank
• Crude Oil Pump Station
• Export Pipe line
• Pig Traps
• Flare and Burn Pit Package
• Utilities

2) Azar Field

The project overall scope is establishment of the required facilities for production of 75,000 BOPD crude from 15 wells.
Produced Oil will be exported to Sabzab station by means of a 270 Km, 16” Export Pipe Line.

Similarly, associated gas will be compressed and exported to NGL-3100 plant by means of a 130 km, 16“ Export Pipe Line. Small portion of the associated gas will be used in gas turbine drives.

The facilities of Azar Field include:

• Well Head Facilities
• 8” flow lines
• 3 Phase Separators (2 stages)
• Desalting Unit
• Stabilization and Sweetening units
• Crude Oil Storage Tanks
• Crude Oil Pump Station
• Oil Export Pipe line
• Pig Traps
• Gas Dehydration Unit
• Gas Compressor Station
• Gas Export Pipe Line
• Waste Water Storage Tank
• Waste Water Treatment Unit
• Waste Water Injection Pumps
• Waste Water Injection Pipeline
• Flare and Burn Pit Package
• Power Generation
• Utilities

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 