    South Pars Gas Field Development Project Phase 17 & 18
 

South Gashu Gas Field Development

 

South Pars Gas Field Development Project Phase 15 & 16

  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

  Lab Sefid Gas Gathering and Injection
   

Kupal Gas Pipeline and Gas Injection Plant

   

NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area

   

SPVC & EPVC Plants

   

South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area

   

Darquain Oil Field Development 2nd Stage

   

4th Aromatics Plant

   

Khangiran Gas Treating Plant - Sulfur Recovery Unit #4

   

Darquain Oil Field Development 1st Stage

   

CO plant

   

Sugar Cane Plant (No. 6 & 7)

   

Heavy Fuel Oil Supply System

   

Iran Air Administration  & Sales Office Building

   

Korpedje Gas Facilities

   

Saipa Expansion Project

   

Iran Khodro Auto Shop

   

Ardestan Textile Industries

   

Polyethylene Pipes and Fitting Production Factory

   

Revamping and up-rating of Abadan Refinery Crude Distillation

   

Khatoon Abad Copper Smelter

 

Projects

South Gashu Gas Field Development

Project:

South Pars Gas Field Development Project Phase 17 & 18

Client:

Petro Negin Jonoob Company

Owner:

Pars Oil & Gas Company (POGC)

Location:

Assaluyeh , Iran

Services:

Detail engineering
Engineering Procurement Services

The IDRO/OIEC/IOEC Consortium has been contracted by the National Iranian Oil Company (NIOC) to conduct the EPCC for South Pars Phases 17&18 project. This project includes offshore facilities, platform and undersea pipelines, and Onshore Facilities for the processing of the reservoir fluid.
Worley Parson Pty Ltd has in turn been contracted by the IDR/OIEC Consortium to conduct the Basic Engineering and FEED for South Pars 17&18 for the onshore facilities.
The South Pars Phases 17&18 Project offshore work-scope is being carried out by a separate Offshore Consultant. Worley Parsons will said, identify and coordinate deliverables to manage the physical interfaces between the Onshore and Offshore Design Consultants.
Tehran Raymand Consulting Engineers has been contracted by PNJ to perform the detail design of some units of South Pars Phases 17&18 for the onshore facilities as described description
The Plant located at Bandar Assaluyeh, in the Iranian sector of Persian Gulf.
The Plant consists of the ON-SHORE GAS PROCESSING PLANT
ON-SHORE GAS PROCESSING PLANT includes following Units:

The Process Units & Process Units Licensed:
Unit No. Description Unit No. Description
100 Inlet facilities 109 Sour Water Stripper
101 Gas Sweetening 110 Back Up Stabilization
103 Condensate Stabilization 111 Propane Refrigeration
105 Ethane Removal 113 Caustic Regeneration
106 Export Gas Compression and Metering 114 Propane Treatment Unit
107 NGL Fractionation 115 Butane Treatment Unit
108 Sulphur Recovery Unit and Tail Gas Treatment 116 Ethane Decarbonisation and Dehydration
The Onshore Utilities and Supporting Facilities:
102 MEG Regeneration 131 Diesel System
104 Gas Dehydration Packages 132 Cooling Water System and Distribution Network
120 Electrical Generation and distribution network 140 Flares and Blowdown
121 Steam and Condensate and Distribution network 141 Utilities and offsite drain System
122 Fuel Gas System and distribution Network 142 Burn Pit
123 The instrument Air Service, 143 Condensate Storage and Export
124 Nitrogen Generation System, network and integration 144 Sulphur Storage and Solidification
125 Sea Water Supply intake Distribution Network 145 Propane Refrigerant Storage Unit
126 Sea Water Desalination Distribution network 146 Chemical Storage
127 Water Polishing 147 Propane Storage and Export
128 Potable Water 148 Butane Storage and Export
129 Waste Effluent Disposal and network 149 Propane Loading Facilities
130 Fire Water System 150 Butane Loading facilities

Tehran Raymand Scope of Work:
The contract between Tehran Raymand and PNJC is limited to below units of South Pars Gas Field Development Project Phases 17 and 18:
1) U108-1/2/3/4 Sulphur Recovery
2) U144 Sulphur Storage And Solidification
3) U109 Sour Water Stripping
4) U122 Fuel Gas Drums
5) U126 Sea Water Desalination
6) U127/U128 Water Treatment Area
7) U131 Emergency Load Generation
8) U131/U146 Diesel/Chemical Storage
9) U132 Cooling Water
10) U140/U142 Flare And Blow Down Drum
11) U141 Utilities And Offsite Drains
12) U142 Burn Pit (Off Plot)
13) U145 Propane Refrigerant Storage
14) U146 Methanol Storage
15) U147 Propane Storage & Export/Refrigeration And LPG Flare
16) U148 Butane Storage And Export/Refrigeration
17) U176 SP/SS /104
18) U176 SP/SS /107 And ITR-9
19) U176 SP/SS/110 And ITR-1
20) U140 Offsite Flare Stack And Burn Pit
21) Main Central And Interconnecting Pipe rack
22) Main Substation And Switchyard
23) Sea Water Intake Substation
The objective of project is to perform FEED updating, general engineering activities, detail engineering design and engineering procurement services for above mentioned area.

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 