a
   
    South Pars Gas Field Development Project Phase 17 & 18
   

South Gashu Gas Field Development

 

South Pars Gas Field Development Project Phase 15 & 16

  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

  Lab Sefid Gas Gathering and Injection
   

Kupal Gas Pipeline and Gas Injection Plant

   

NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area

   

SPVC & EPVC Plants

   

South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area

   

Darquain Oil Field Development 2nd Stage

   

4th Aromatics Plant

   

Khangiran Gas Treating Plant - Sulfur Recovery Unit #4

   

Darquain Oil Field Development 1st Stage

   

CO plant

   

Sugar Cane Plant (No. 6 & 7)

   

Heavy Fuel Oil Supply System

   

Iran Air Administration  & Sales Office Building

   

Korpedje Gas Facilities

   

Saipa Expansion Project

   

Iran Khodro Auto Shop

   

Ardestan Textile Industries

   

Polyethylene Pipes and Fitting Production Factory

   

Revamping and up-rating of Abadan Refinery Crude Distillation

   

Khatoon Abad Copper Smelter

 

Projects

South Gashu Gas Field Development

Project:

South Gashu Gas Field Development

Client:

Iranian Central Oil Field Company

Owner:

Iranian Central Oil Field Company

Location:

Gashu, Iran

Services:

Conceptual Design
Basic Engineering and FEED package preparation
EPCC tender documents

In order to develop South Gashu gas field for gas refining, transportation to IGAT7 and by product exportation (Such as Naphtha and Sulfur), Iran Central Oil Field Company (ICOFC), has defined this project.
South Gashu gas fields are located 70Km from west of Bandar Abbas, 25 Km north of Persian gulf and 80 Km from Sarkhun refinery plant.

Project is mainly divided to below sections:

South Gashu upstream facilities
Gas refinery plant
Interconnecting pipelines between wellheads, refinery and IGAT7

Project upstream main units and facilities consist of:

1) Wellhead facilities
2) Flow lines
3) Gathering and separation centers
4) Access Roads
5) Water supply and distribution facilities
6) Communication and SCADA system

Project downstream main units and facilities consist of:

1) Feed receiving
2) Sweetening
3) Dehydration / HC dew point tolerated process
4) Compression station
5) Product collect and transportation
6) Polishing
7) Refrigeration unit
8) Electrical and control System
9) Utility station (steam, air, water, electricity, fuel, Fire water…)
10) Sulfur recovery
11) Administration; operation and stock building
12) HVAC package
13) Gas/sulfur products loading and transportation
14) Sulfur storage facilities
15) Power supply
16) Communication, paging, CCTV
17) Metering facilities

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved