a
   
    South Pars Gas Field Development Project Phase 14
    Tang-E-Bijar & Kamankuh  gas field
    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
    South Pars Gas Field Development Project Phase 17 & 18
    South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

 

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
    Revamping and up-rating of Abadan Refinery Crude Distillation
 

Projects

Collecting Associated Gases of the 2nd Stage of Separation in Gachsaran Production Units 1&2

Project:

Collecting Associated Gases of the 2nd Stage of Separation in Gachsaran Production Units 1&2

Client:

National Iranian South Oil Company (NISOC)

Owner:

National Iranian Oil Company (NIOC)

Location:

Gachsaran , Iran

Services:

Conceptual Study and Basic Engineering
Preparation of FEED and EPC Package

Policies of the National Iranian South Oil Company (NISOC) dictate utilization of all associated gases for the purpose of pollution control, energy preservation and its proper usage in the potential markets and industries. Considering the increasing amount of associated gas, produced from different stages of separations in Gachsaran Production Units 1&2, and in accordance with this point that the amount of associated gas from the second stage separation is more than the capacity of low pressure compressor and total amount of gas (including discharge of low pressure compressor and wells gas) is lower than the capacity of high pressure compressors, installing electro driven gas compressors with a capacity of 6 MMscf (in each compressor station) will provide the opportunity to use the remaining capacity of high-pressure compressors as well as preventing flaring the associated gases released from the second stage of production unit.

In lights of the above, Tehran Raymand Consulting Engineers has awarded to accomplish the conceptual, basic design, front-end engineering design (FEED) & preparing EPC Tender documents of a project titled “Collecting Associated Gases of the Second Stage of Separation in Gachsaran’ Production Units 1 & 2’ on the basis of its policies to maintain efficient and well-protected facilities throughout the life of the plant.

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved