    South Pars Gas Field Development Project Phase 14
    Tang-E-Bijar & Kamankuh  gas field
    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
    South Pars Gas Field Development Project Phase 17 & 18
    South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

 

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
    Revamping and up-rating of Abadan Refinery Crude Distillation
 

Projects

Lab Sefid Gas Gathering and Injection

Project:

Lab Sefid Gas Gathering and Injection

Client:

National Iranian South Oil Company (NISOC)

Owner:

National Iranian Oil Company (NIOC)

Location:

Dezful, Iran

Services:

Conceptual Study and Basic Engineering
Preparation of FEED Package

Lab Sefid Gas Gathering and Injection Project is defined by National Iranian South Oil Company to prevent flaring of associated gas from Lab Sefid Production Unit which is located 50 km, north east of Dezful.
By commissioning this project, the existing Lab Sefid Production Unit will be extended and the following units/pipeline will be added:

-Sweetening Unit

-Sweetening 17000 Standard Barrel per Day of sour Lab sefid / Palangan crude oil

-Gas Compression & Injection Unit

Released gas from Labsefid Production Unit will be compressed in different stages after gathering and finally injected to Labsefid well no.7. The maximum required injection rate is 27000 MMSCFD.
According to the fact that the amount of Labsefid oil field associated gas is less than that required for injection to Labsefid well no.7, Bangestan gas from well no.5 will be used as a supplementary source.

-Pipeline facilities

Gas Transferring Pipeline: For transferring Bangestan gas from well no.5 to production unit which is approximately 5.5 Km away.
Injection Pipeline: For transferring compressed gas from Compression Unit to Labsefid well no.7 which is approximately 6 Km away.

-Facilities

Instrument/Plant Air
Fuel Oil/Gas System
Closed Drain System
Flaring System
Fire/Potable/Service Water Network
Waste Water Treatment
Chemical Injection

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 