    South Pars Gas Field Development Project Phase 17 & 18
   

South Gashu Gas Field Development

 

South Pars Gas Field Development Project Phase 15 & 16

  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

  Lab Sefid Gas Gathering and Injection
   

Kupal Gas Pipeline and Gas Injection Plant

   

NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area

   

SPVC & EPVC Plants

   

South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area

   

Darquain Oil Field Development 2nd Stage

   

4th Aromatics Plant

   

Khangiran Gas Treating Plant - Sulfur Recovery Unit #4

   

Darquain Oil Field Development 1st Stage

   

CO plant

   

Sugar Cane Plant (No. 6 & 7)

   

Heavy Fuel Oil Supply System

   

Iran Air Administration  & Sales Office Building

   

Korpedje Gas Facilities

   

Saipa Expansion Project

   

Iran Khodro Auto Shop

   

Ardestan Textile Industries

   

Polyethylene Pipes and Fitting Production Factory

   

Revamping and up-rating of Abadan Refinery Crude Distillation

   

Khatoon Abad Copper Smelter

   

 

 

Projects

SPVC & EPVC Plants

Project:

SPVC & EPVC Plants

Collaboration With:

Sazeh Consultants

Owner:

Arvand Petrochemical Company

Location:

Bandar Imam, Iran

Cooperation With Other Companies:

Uhde (Germany)

Services:

Detail engineering
Procurement Management

Establishment of a PVC COMPLEX is one of NPC's objective development projects, and ARVAND Petrochemical Company as fully owned affiliate of NPC intends the project under its defined requirements as set forth in the contract documents.

 The COMPLEX located at site No. 2 of Special Economic Zone in Bandar Imam, North West of Persian Golf. 

The COMPLEX consists of the COMMON FACILITIES/STORAGE UNITS and the following plants:

  1. C/A Plant
  2. EDC/VCM Plant
  3. S-PVC Plant
  4. E-PVC Plant

S&E PVC Plants are including following Civil Units:

C420 Dissolving C425 Dissolving
C430 Polymerization C455 Latex Storage and Filteration
C450 Drying C465 Drying
C480 Storage C485 Bagging and Storage
C485 Bagging C535 Waste Water Treatment
C510 VCM Recovery C605 Pipe Rack
C530 Waste Water Treatment    
C603 Pipe Rack    

   

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved