    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
  South Pars Gas Field Development Project Phase 17 & 18
  South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
   

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

   

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
 

Projects

NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area

Project:

NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area

Client:

National Iranian South Oil Company (NISOC)

Owner:

National Iranian Oil Company (NIOC)

Location: Ahwaz / Bandar Maah-shahr, Iran

Cooperation With Other Companies:

Sazeh Consultants (JV Partner)

Services:

Feasibility Study
Basic Engineering
Value Engineering
FEED Package Preparation
Preparation of Tender Package for EPCC Project

A) NGL-2300 (Ahwaz)

The purpose of NGL-2300 plant is to maximize the C2+ recovery. The feed gas for this plant is provided from:

  1. Separated gas from 1st stage of Maroon-Khami plant (156 MMSCFD)
  2. Gas condensate stabilization units of Maroon-Khami plant (18 MMSCFD)
  3. Produced gas from Maroon-5 production unit (82 MMSCFD)

Recovered C2+ condensates in this plant are transferred to CFU-200 separation unit in Mahshahr and produced sweet gas is injected to Maroon oil field.

This plant consists of following units:

  • LP gas compression unit
  • Gas sweetening unit
  • Gas dehydration unit
  • Acid gas compression unit
  • C2+ recovery unit
  • C2+ purification unit
  • Utilities
  • Pipelines (C2+ condensates, Sweet Gas and Acid Gas)

B) CFU-200 C2+ Separation plant (Bandar Maah-Shahr)

C2+ from NGL 2300 (Above), NGL 1700, 1900 & 2000 is gathered in CFU-200 plant. In this plant Ethane, Propane, Butane and C5+ will be recovered and stored/transferred. This plant includes below units:

  • De-Ethanizer
  • De-Propanizer
  • De-Butanizer
  • Storage Tanks (for Propane, Butane and C5+)
  • Transfer Pumps
  • Utilities
a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 