a
   
    Kharg Gas Gathering & NGL Recovery  Project (Interconnecting)
    Managing Consultant and Technical Support Services for Desalting Development Projects
    Azar & Changuleh Oil Fields Development Project
  South Pars Gas Field Development Project Phase 17 & 18
  South Gashu Gas Field Development
  South Pars Gas Field Development Project Phase 15 & 16
  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
   

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

   

Managing Consulting for Preparation of Basic Package and EPC Tender Documents for “Odorant Production Unit”

    Lab Sefid Gas Gathering and Injection
    Kupal Gas Pipeline and Gas Injection Plant
    NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area
    SPVC & EPVC Plants
    South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area
    Darquain Oil Field Development 2nd Stage
    4th Aromatics Plant
    Khangiran Gas Treating Plant - Sulfur Recovery Unit #4
    Darquain Oil Field Development 1st Stage
    CO plant
    Sugar Cane Plant (No. 6 & 7)
    Heavy Fuel Oil Supply System
    Iran Air Administration  & Sales Office Building
    Korpedje Gas Facilities
    Saipa Expansion Project
    Iran Khodro Auto Shop
    Ardestan Textile Industries
    Polyethylene Pipes and Fitting Production Factory
 

Projects

Revamping and up-rating of Abadan Refinery Crude Distillation

Project:

Polyethylene Pipes and Fitting Production Factory

Client:

National Iranian Oil Company (NIOC)

Owner:

National Iranian Oil Company (NIOC)

Location:

Abadan, Iran

Abadan Refinery is now experiencing a pronounced change in crude composition, which not only is becoming heavy, but also sour. In addition, the situation is further aggravated by the fact that salt content of the crude is increased. These changes have direct effect on fouling of heat exchangers and increasing in corrosion rate.    
In order to overcome such difficulties, improve heat recovery and reduce load on furnaces, Abadan Refinery have decided to install desalting facilities, and modify preheat system in crude distillation units, No. 70, 75 and 80. The facilities include the following:

1. Revamping and up-rating of the Atmospheric Distillation Unit (CDU 85) including preheat and Desalting System and Flash Drum.

2.Vacuum Distillation Unit.

3.Visbreaker

4. Tempered Water System, Sour Water Stipper, Storage Tanks and Visbreaker Pump House.

Tehran Raymand was in charge of preparing the Specifications and Data sheets for Fixed Equipment.
a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved