a
   
    South Pars Gas Field Development Project Phase 17 & 18
   

South Gashu Gas Field Development

 

South Pars Gas Field Development Project Phase 15 & 16

  Collecting associated gases of the 2nd stage of seperation in Gachsaran production units 1 & 2
 

Reviewing FEED Package and EPC Tender Documents for Gas Sweetening Pilot Plant

  Lab Sefid Gas Gathering and Injection
   

Kupal Gas Pipeline and Gas Injection Plant

   

NGL-2300 and CFU-200 (C2+ Separation) Units and Tankage Area

   

SPVC & EPVC Plants

   

South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area

   

Darquain Oil Field Development 2nd Stage

   

4th Aromatics Plant

   

Khangiran Gas Treating Plant - Sulfur Recovery Unit #4

   

Darquain Oil Field Development 1st Stage

   

CO plant

   

Sugar Cane Plant (No. 6 & 7)

   

Heavy Fuel Oil Supply System

   

Iran Air Administration  & Sales Office Building

   

Korpedje Gas Facilities

   

Saipa Expansion Project

   

Iran Khodro Auto Shop

   

Ardestan Textile Industries

   

Polyethylene Pipes and Fitting Production Factory

   

Revamping and up-rating of Abadan Refinery Crude Distillation

   

Khatoon Abad Copper Smelter

   

 

 

Projects

South Pars Gas Field Development Phases 6,7 & 8 C4A Up-Stream Area

Project:

South Pars Gas Field Development Phases 6,7& 8 C4A Up-Stream Area

Collaboration With:

Sazeh Consultants

Owner:

Pars Oil and Gas Company (POGC)

Location:

Assaluyeh, Iran

Cooperation With Other Companies:

Sazeh Consultant Co.

Industrial Projects Management of Iran

Toyo Engineering Company

Services:

Detail engineering

South Pars Gas Field Development, Phases 6, 7 & 8, is a grass root gas plant located at Assaluyeh (270 Km south east of Bushehr).
The field will produce gas and condensate for onshore treatment. The facilities for phases 6, 7 & 8 will be designed to produce, treat and transport a total of 3000 MMSCFD of reservoir fluids from three development phases of 1000 MMSCFD each (on a dry basis).

C4A upstream facilities are included of below process units:

Unit  100 :     Reception Facilities
Unit  101 :     HP Separation unit
Unit  102 :     MEG Recovery
Unit  109 :     Sour Water Stripper
Unit  140 :     Flare KO Drums
Unit  142 :     Closed Drain Drum Unit  145 :     Propane Bullet

 

a

 

TR Organization
Being a project-driven organization, Tehran Raymand has adopted a matrix organization chart, in order to provide flexibility for delivering different EPCM projects. The organization chart showing the top management, main divisions and the subdivisions of the company is shown in the following links...
 
 
Copyright © 2004-2008 Tehran Raymand Co. All rights reserved